Which of the following is not a benefit of lean production?


A) Greater flexibility
B) Increased capacity
C) More customers
D) More product variety

E) B) and D)
F) None of the above

Correct Answer

verifed

verified

Which of the following is not a basic element of lean production?


A) flexible resources
B) pull system
C) repetitive production
D) small lot production

E) A) and B)
F) A) and C)

Correct Answer

verifed

verified

In a lean production system,kanban systems have been shown to handle large fluctuations in the production requirements on the final assembly line.

A) True
B) False

Correct Answer

verifed

verified

Lean concepts cannot be applied to services because services are intangible.

A) True
B) False

Correct Answer

verifed

verified

Analyzing process flow and eliminating waste is referred to as


A) just-in-time.
B) the Toyota Production System.
C) value stream mapping
D) total productive maintenance.

E) None of the above
F) All of the above

Correct Answer

verifed

verified

Small-lot production reduces lead time but increases quality problems.

A) True
B) False

Correct Answer

verifed

verified

Poka-yolk is a Japanese term used to describe the removal of waste in a lean production system.

A) True
B) False

Correct Answer

verifed

verified

A workstation's output is 200 bottles of wine per hour.It takes 45 minutes to receive a withdrawal kanban of corks from the previous workstation.The withdrawal kanban is attached to a container holding 30 corks.The process uses a safety factor of 20 percent.What is the number of withdrawal kanbans needed to support the bottling process.


A) 4
B) 5
C) 6
D) 3

E) All of the above
F) C) and D)

Correct Answer

verifed

verified

Lower inventory levels make processes


A) less dependent on each other while keeping bottlenecks hidden.
B) less dependent on each other while revealing bottlenecks more quickly.
C) more dependent on each other while revealing bottlenecks more quickly.
D) more dependent on each other while keeping bottlenecks hidden.

E) B) and D)
F) All of the above

Correct Answer

verifed

verified

A workstation must produce 400 units an hour.It takes 24 minutes to receive the necessary material for production from the previous workstation.Output is moved between workstations in containers holding 44 units.If the process uses a safety factor of 10%,then the number of kanbans that should be circulating between this workstation and the previous workstation is


A) 2
B) 4
C) 6
D) 8

E) B) and D)
F) B) and C)

Correct Answer

verifed

verified

What are the benefits of small-lot production?

Correct Answer

verifed

verified

Small-lot production requires less space...

View Answer

In lean production,waste is defined as anything that does not add value to the product.

A) True
B) False

Correct Answer

verifed

verified

___________ is generally credited with the development of lean production.


A) Frederick Taylor
B) W.Edwards Deming
C) Taiichi Ohno
D) None of the above.

E) A) and D)
F) A) and C)

Correct Answer

verifed

verified

Early adopters of lean production in the U.S.were unsuccessful because they tried to implement lean by slashing inventories and forcing their suppliers to make more frequent deliveries.

A) True
B) False

Correct Answer

verifed

verified

______________ setups that can be performed in advance while the machine is running.


A) Internal
B) External
C) Parallel
D) Unnecessary

E) None of the above
F) A) and C)

Correct Answer

verifed

verified

Setup time is not a component of the cumulative lead time for a manufactured product.

A) True
B) False

Correct Answer

verifed

verified

Total productive maintenance combines preventive maintenance with kaizen.

A) True
B) False

Correct Answer

verifed

verified

A workstation's output is 200 bottles of wine per hour.It takes 30 minutes to receive a withdrawal kanban of corks from the previous workstation.The withdrawal kanban is attached to a container holding 30 corks.The process uses a safety factor of 20 percent.What is the number of withdrawal kanbans needed to support the bottling process?


A) 10
B) 2
C) 8
D) 4

E) B) and C)
F) None of the above

Correct Answer

verifed

verified

Lean production is difficult to implement when


A) demand is highly variable.
B) product variety is high..
C) there are many unique products.
D) all of the above are true.

E) A) and D)
F) C) and D)

Correct Answer

verifed

verified